2009 - Present |
DESIGNATION
Project Manager
Diving Superintendent
Operation Superintendent
IMCA Bell Diving Supervisor - (Cert # 3611)
IMCA Air Diving Supervisor - (Cert # 7070)
|
JOB DESCRIPTION
- Overall in Charge / Supervision as Project Manager / Diving / Operation Superintendent of:-
- PCSB - Pipeline & structure's underwater inspection & maintenance contract 2009 - Nell & Air Diving Operation & ROV Operation.
- UWILD - FSO ABU & FPSO BUK - Air Diving & ROV mode.
- PLIDCO Clamps installation at PUA-TAA PL026 12" crude oil pipeline, 12" spool-piece subsea tie-in project at PMO Region. Saturation Diving & ROV Operation.
- Riser guards installtion at SBO Region. Major platform inspection at SKO Region. Shut down - PMO 6" & 16" DIA riser sectional replacement.
- SBM 5 change out with SBM Bluewater - Open/closed PLEM valves. Dismantle & re-installation of mooring hawsers, floating hoses, subsea hoses & chain stopppers within 10 days as per project scheduled.
- Major playform inspection at Kumang, West Lutong & Tukau Oil Field. Anode replacement at West Lutong Field. Air Diving & ROV Operation.
- Underwater pipeline defects verification, pipeline crossing support installation & anchors removal project at SBO Region, Sabah.
- 6" gas pipeline leak repair work at BADP-C platform at SKO Region, Sarawak.
- Retreival & re-instatement of XPP Data Logger at Duyong-B Platform, PM9 Field, Anode Sleds installation PMO Region, Terengganu Water.
- Boat landing & riser guard new installation & replacement on selected platforms at SKO & SBO Regions project.
- Direct Supervision as IMCA Bell & Air Diving Supervisor:-
- Major platform inspection at ANGSI, TIONG, BEKOK Oil Field, SMQ-A, SMR-A, SUDP-A, SUPG-B, KINDP-A, TBG-B & EWG-A. Modifying the identified riser bend for smart flange installation prior to insert the first of its own RTP tubing into existing pipeline @ PL-122 SMJT-C to SMJT-D, Samarang Oil Field. 30" Caisson with associate piping replacement @ BEKOK-A.
- 16" x 44km Dalak pipeline from Petronas Methanol Labuan (PML-2) tp Tee-Off Sipitang, Sabah.
- SPM - 10" floating hose installation at BMC SPM, Brunei.
- Dismantling 10" spool for repair works & re-installation subsea tie-in for re-commissioning work project at BK-A, Terengganu Water.
- MOPU-SEPAT inspection works - AFMD, MPI & CVI Project at MOPU-SEPAT, Terengganu Water.
- Flexible pipeline - Samarang Redevelopment Project Phas 2 EOR - Samarang I-tube & riser guard installation - SMJT-E, SUPG-B & SMP-B. Debris clearance at Zhuhal Field at Samarang Field, Sabah. PLIDCO Clamps installation, sectional pipeline repair using smart flanges, retrofit anodes replacement & installation at SKO Region, Sarawak.
|
2001 - 2009 |
DESIGNATION
ADAS Part 4 Saturation Diver
IMCA Trainee Air Diving Supervisor
ADCI Air Diving Supervisor
ROV Pilot Technician
|
JOB DESCRIPTION
- Platform installation - F23 DP-A & M3 DR-A, riser & J-Tube clamps, subsea spool-piece tie-in & SCMMB F23 Wellhead installation.
- Installing conductor guide's clamps on SIFT-B Platform.
- Pipelay - 8", installing monopod jacket - SMK-A, riser's clamps & concrete.
- Laying bitumen mattresses in Sabah Water.
- Installing pipeline's retrofit anodes at MASA Oil Field project.
- Laying 24" DIE cladded steel pipeline M1 DR-A to JNDR project.
- Installing E11R-B - 32" DIE riser spoolpiece subsea tie-in & riser clamps installation, laying 4" power cable & bitumen mattresses for cable crossing.
- F23 Wellhead SCMB leakage repairing & pipeline freespan project.
- Installing TEDP-B Caisson's Guide & clamps.
- 30" DIA riser subsea tie-in & 28" & 30" riser clamps repair project.
- Duyong Shallow Gas Mitigation Project.
- General annual inspection & maintenance of Penstoke's Gates MLNG Terminal.
- Underwater Broco cutting of Conductor's Guide & ANDP-C jacket installation project.
- KTM-A & KTV-A Platform Decommisioning Project.
- BADP-B Platform drilling holes & grouting on all jacket's legs project.
- Re-installation of 24" DIA steel cladded pipeline, Broco cutting of 24" DIA riser & riser's clamp installation project.
- Subsea tie-in of 12" & 10" DIA FPSO's spool piece to pipeline project.
- 6" DIA riser & riser's clamps installation & BA-8 jacket removal project.
- 8" DIA pipelay, riser & riser clamps installation at Chunxiao Oil & Gas Field, China Water.
- 16" & 12" riser subsea tie-in & laying concrete mattresses at CEP, CHX, China Oil Field.
- 24" spool - PLEM tie-in, installing 42" pipe's sleeper, PLEM & future receiver subsea structure, Hydratight Bolts, Broco cut extra piles, torque wrenching the sleep's bolts & aligning the 24" spool - PLEM tie-in & pig catcher project at Rayong Oil Field in Thailand.
- Riser clamps installation, subsea cable laying & subsea tie-in at Natuna Oil Field, KRA PLEM & platform, Hang Tuah Platform project in Indonesia.
- Riser removal & replacement project. AHOC : MHS SuperPuma Chopper crashed wreckage recovery at Bayan Oil Field, Bintulu Water.
- West Lutong Pipeline replacement project - Post Trenching - 18" & 24" pipeline.
- Installting riser clamps, concrete mattresses, sleepers & sand bagging for riser crossing points for the East Champion Riser Installation Project at Champion 7 Oil Field, Brunei.
- Grouting the Annulus Conductor Guide Clamps, jacket's selected members & re-alignment of conductor guide frame & annulus conductor's guide frame @ -12m at SKO Region.
- 6", 8", 20" & 24" DIA pipeline subsea tie-in project at West Patricia Oil Field, Bintulu.
|
1994 - 2001 |
DESIGNATION
Construction & Inspection Part 1 Commercial Diver
|
JOB DESCRIPTION
- Shell's major underwater inspection & maintenance project.
- Saturation diving support team - pipeline hyperbaric welding project.
- UWILD - ABS survey jack-up rig (RANDOLF YOST & TRIDENT XII).
- Laying fiber optic cable & grout mattresses installation for Telekom Malaysia Project.
- MLNG Cooling Water Intake Station major shut down inspection & maintenance project.
- Slipway installation for JKR Workshop in Labuan project.
- SBM chane out, general inspection & maintenance project.
- Salvaging sunken dump barges in Sarawak River in Bintulu project.
- Installation pig launcher & riser clamps project in Sarawak & Sabah Oil Field.
- Installing conductor guide project in Sarawak & Sabah Oil Field.
- 28" DIA pipelay, subsea tie-in & beach pull project at Resak Field in Terengganu Water.
- Platform installation - F6K-A, ANDR-A, 8" DIA pipelay at Samarang Oil Field, Sabah Water, laying pipeline - 32" DIA ANDR-A to GUD-C, 32" DIA OSC Kertih to ANDR-A & ANGSI 12", 6" & 32" DIA pipelines.
- SBM general inspection & underwater painting in Melaka Water.
|